Emerald Bay Energy Tests Kuhn A5 Well at 142 BBLS/Day of Oil
Emerald Bay Energy Inc. (TSX Venture: EBY) (the “Company” or “Emerald Bay”) is pleased to announce that testing operations of the Kuhn A5 well have been completed. The Company perforated and acid stimulated a seven foot interval of the Austin Chalk formation, and swab tested the well for two days to determine inflow rates and oil cut. Over the course of the test the well produced oil at the rate of 142 barrels per day. The Company is now making preparations to put the well on production.
ABOUT EMERALD BAY
Emerald Bay Energy Inc. (EBY) is an energy company with oil producing properties in southwest Texas as well as non operated oil and natural gas interests in Central Alberta, Canada. EBY is the operator of the Wooden Horse and Nash Creek Projects in Guadeloupe, Texas, where the Company currently now owns a 50.00% working interest in those projects. The Company also owns 75% of Production Resources Inc., a South Texas oil company.
To stay informed on Emerald Bay Energy, please join our Investor Group at https://www.8020connect.com/groups/emerald-bay-energy-inc for all upcoming news releases, articles, comments and questions.
For further information, please contact: Emerald Bay President, Shelby D. Beattie, (403) 262-6000, info@ebyinc.com, www.ebyinc.com
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.