Emerald Bay Energy Begins Kuhn 3 Re-Entry

 In News, Press Releases

Emerald Bay Energy Inc. (TSX Venture: EBY) (the “Company” or “Emerald Bay”) is pleased to announce that operations have begun to re-enter the Kuhn 3 well and acidize the previously unstimulated Upper Austin Chalk formation. As Kuhn 3 is 40 feet high to the recently completed Kuhn 4 well, our technical team anticipates similar, if not better results. The well will be swab tested over the next 7-10 days to determine flow rates, and the Company will provide further information when it is available.

ABOUT EMERALD BAY

Emerald Bay Energy Inc. (EBY) is an energy company with oil producing properties in southwest Texas as well as non operated oil and natural gas interests in Central Alberta, Canada. EBY is the operator of the Wooden Horse and Nash Creek Projects in Guadeloupe, Texas, where the Company currently now owns a 50.00% working interest in those projects. The Company also owns 75% of Production Resources Inc., a South Texas oil company.

To stay informed on Emerald Bay Energy, please join our Investor Group at https://www.8020connect.com/groups/emerald-bay-energy-inc for all upcoming news releases, articles, comments and questions.

For further information, please contact: Emerald Bay President, Shelby D. Beattie, (403) 262-6000, info@ebyinc.com, www.ebyinc.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Recommended Posts
Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text. captcha txt